Country profile · Rank 12 of 108 · Sleeping Giant
Algeria compute capacity
Algeria runs about 30 MW of live datacenter capacity as of 7 September 2026, a Gross Domestic Compute of $1.5B (an estimate). Its identified energy resource could host about 130 GW of AI compute, a ceiling worth $7.8 to 10.4T at today's price of a gigawatt, about 36 times its $286B GDP. The bankable slice today, discounted mainly for capital markets and momentum, is $1.1T, or $23,205 per person. Algeria is a sleeping giant, ranked 12 of 108 countries by unlockable value.
Key numbers
| Live datacenter capacity | 30 MW | IT capacity, mid-2026. Estimate: below the top 35 markets. |
|---|---|---|
| Live compute (GDC) | $1.5B | Live GW × $50B, the central price of an AI factory. |
| Resource ceiling | 130 GW | Identified hydro, geothermal, solar, wind and surplus fossil resource. |
| Ceiling value | $7.8 to 10.4T | Ceiling GW × $60 to 80B per GW, NVIDIA's all-in figure. |
| Ceiling as a multiple of GDP | 36× | High end over nominal GDP of $286B (IMF). |
| Unlockable value | $1.1T | Firm untapped GW × $50B × readiness. The bankable slice. |
| Unlockable per person | $23,205 | IMF population, 2026. |
| Built | 0.2% | Hydro and geothermal already installed, over the ceiling. |
| Readiness | 50% | Eight-part discount. Binding: capital markets and momentum. |
| Conversion score | 5 | 0 to 100. Unchanged since 19 Aug. |
| Tier | Sleeping Giant | Ceiling at least 10× GDP, readiness under 65%. The endowment is real and the to-do list is long. |
| Rank | 12 of 108 | By unlockable value. 2 of 14 in MENA. |
Three numbers, one scale
Ceiling is what the endowment could host; unlockable is the slice underwriters would sign today; live compute is what runs. Drawn on one linear scale on purpose: the gap is the point.
Projects on the ground
No sovereign AI factory for Algeria is on the register yet. Announcements, contracts and stalls are tracked as reported; send one to the desk.
MENA: how Algeria compares
| # | Country | Unlockable | Live compute | Readiness | Tier |
|---|---|---|---|---|---|
| 9 | $1.6T | $15B | 74% | Primed | |
| 12 | $1.1T | $1.5B | 50% | Sleeping Giant | |
| 25 | $608B | $2.5B | 73% | Primed | |
| 26 | $588B | $2.5B | 33% | Sleeping Giant | |
| 28 | $566B | $10B | 65% | Emerging Upside | |
| 29 | $535B | $4.0B | 57% | Sleeping Giant | |
| 37 | $413B | under $1B | 24% | Sleeping Giant | |
| 38 | $406B | $30B | 83% | Incumbent | |
| 42 | $344B | $4.0B | 79% | Primed | |
| 45 | $328B | $2.0B | 64% | Sleeping Giant | |
| 53 | $285B | $2.5B | 65% | Emerging Upside | |
| 59 | $253B | $1.0B | 33% | Sleeping Giant | |
| 84 | $144B | $1.5B | 60% | Emerging Upside | |
| 105 | $13B | $15B | 80% | Incumbent |
What compute costs right now
The price of the silicon a country would host, from the tape. Labeled buy-now prints from named venues.
Questions people ask
How much data center capacity does Algeria have?
Algeria runs about 30 MW of live datacenter IT capacity as of 7 Sep 2026, an estimate: country totals below the top 35 markets are estimated. Valued at $50B per gigawatt, that is a Gross Domestic Compute of $1.5B.
What is Algeria's compute net worth?
The ceiling is $7.8 to 10.4T: 130 GW of identified hydro, geothermal, solar, wind and surplus fossil resource valued at $60 to 80B per gigawatt, NVIDIA's all-in figure for an AI factory. That is 36 times Algeria's $286B GDP. The bankable slice today, after a readiness discount of 50%, is $1.1T.
What holds Algeria back from converting its energy into compute?
Readiness scores 50% on an eight-part discount stack (governance, stability, GPU access, grid, fiber, momentum, physical conditions and capital access). For Algeria the binding discounts are capital markets and momentum. It has built 0.2% of its ceiling as generating capacity, and its conversion score is 5 of 100.
How does Algeria compare with its neighbours?
Algeria ranks 12 of 108 countries by unlockable value, and 2 of 14 in MENA. The regional leader is Saudi Arabia at $1.6T unlockable and $15B of live compute.
Cite this page
Free with attribution for research, journalism and personal use. Method, sources and every parameter: how the numbers are made.