  "as_of": "2026-08-22",
  "title": "Campuses",
  "kicker": "Named projects · sourced grain, not a census",
  "cite": "Hamal, P. (2026). Campuses. compute.world.",
  "description": "A desk-curated globe of named data-center campus projects. Not a global inventory. Megawatt figures keep their grain. compute.world.",
  "lede": "This is a desk-curated named-project register, not a global inventory. Twenty-three pins, each folded from a primary the desk fetched. Primaries that publish a megawatt figure are almost all ≥250 MW announcements. Energized MW is almost never published. A 4.75 GW interconnection is not IT. SSA, South Asia, and APAC-ex-Oceania have no pins in this book — that is a coverage hole, not a load of zero. Homer City Energy Campus is held: it is a generation plant.",
  "notes": [
    "Not a census. Empty regions and empty small-MW filters are coverage holes, not bugs.",
    "MW-null / not_disclosed pins stay on the default view. A MW-threshold filter hides them; they cannot pass a numeric floor.",
    "Never imply a pin is live load unless status is operational and the primary said so.",
    "Do not treat LBNL Queued Up as data-center load. It is generation interconnection.",
    "Homer City Energy Campus is held (generation plant). It is not a pin."
  ],
  "held": [
    {
      "name": "Homer City Energy Campus",
      "reason": "generation plant"
    }
  ],
  "coverage_holes": ["SSA", "SASIA", "APAC"],
  "projects": [
    {
      "id": "meta-hyperion-richland-parish",
      "name": "Richland Parish Data Center (Hyperion)",
      "operator": "Meta",
      "place": "Richland Parish (Holly Ridge), Louisiana, USA",
      "admin1": "Louisiana",
      "country_iso3": "USA",
      "region": "NORAM",
      "lat": 31.8957154,
      "lon": -91.4717854,
      "mw": 5000,
      "mw_grain": "it_capacity",
      "mw_phrase": "expanding our AI-optimized data center in Richland Parish, Louisiana to 5 GW in compute capacity",
      "mw_as_of": "2026-07-13",
      "status": "in_progress",
      "status_phrase": "since breaking ground on the Richland Parish Data Center",
      "status_as_of": "2026-07-13",
      "url": "https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/",
      "source": "primary",
      "notes": ""
    },
    {
      "id": "meta-lebanon-indiana-leap",
      "name": "Lebanon Data Center (LEAP District)",
      "operator": "Meta",
      "place": "Lebanon, Indiana, USA",
      "admin1": "Indiana",
      "country_iso3": "USA",
      "region": "NORAM",
      "lat": 40.0483744,
      "lon": -86.4691677,
      "mw": 1000,
      "mw_grain": "it_capacity",
      "mw_phrase": "Designed to deliver 1GW of capacity",
      "mw_as_of": "2026-02-11",
      "status": "in_progress",
      "status_phrase": "we're breaking ground on a state-of-the-art data center in Lebanon, Indiana",
      "status_as_of": "2026-02-11",
      "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
      "source": "primary",
      "notes": ""
    },
    {
      "id": "microsoft-fairwater-mount-pleasant",
      "name": "Fairwater datacenter (Mount Pleasant)",
      "operator": "Microsoft",
      "place": "Village of Mount Pleasant, Wisconsin, USA",
      "admin1": "Wisconsin",
      "country_iso3": "USA",
      "region": "NORAM",
      "lat": 42.719161,
      "lon": -87.8543362,
      "mw": null,
      "mw_grain": "not_disclosed",
      "mw_phrase": "",
      "mw_as_of": "",
      "status": "operational",
      "status_phrase": "The facility is now fully operational",
      "status_as_of": "2026-06-23",
      "url": "https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/",
      "source": "primary",
      "notes": ""
    },
    {
      "id": "microsoft-fairwater-atlanta",
      "name": "Fairwater AI datacenter (Atlanta)",
      "operator": "Microsoft",
      "place": "Atlanta, Georgia, USA",
      "admin1": "Georgia",
      "country_iso3": "USA",
      "region": "NORAM",
      "lat": 33.7544657,
      "lon": -84.3898151,
      "mw": null,
      "mw_grain": "not_disclosed",
      "mw_phrase": "",
      "mw_as_of": "",
      "status": "operational",
      "status_phrase": "The new AI datacenter in Atlanta, which began operation in October, is the second in Microsoft’s Fairwater family",
      "status_as_of": "2025-11-12",
      "url": "https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/",
      "source": "primary",
      "notes": ""
    },
    {
      "id": "vantage-frontier-shackelford",
      "name": "Frontier",
      "operator": "Vantage Data Centers",
      "place": "Shackelford County, Texas, USA",
      "admin1": "Texas",
      "country_iso3": "USA",
      "region": "NORAM",
      "lat": 32.7088752,
      "lon": -99.3307616,
      "mw": 1400,
      "mw_grain": "it_capacity",
      "mw_phrase": "a mega-scale 1.4GW data center campus in Shackelford County, Texas",
      "mw_as_of": "2025-08-19",
      "status": "in_progress",
      "status_phrase": "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026",
      "status_as_of": "2025-08-19",
      "url": "https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/",
      "source": "primary",
      "notes": ""
    },
    {
      "id": "crusoe-abilene-lancium",
      "name": "Crusoe AI data center at Lancium Clean Campus (Abilene)",
      "operator": "Crusoe",
      "place": "Abilene, Texas, USA",
      "admin1": "Texas",
      "country_iso3": "USA",
      "region": "NORAM",
      "lat": 32.44645,
      "lon": -99.7475905,
      "mw": 1200,
      "mw_grain": "facility_power",
      "mw_phrase": "the second phase, which added six additional buildings to bring total campus capacity to 1.2 GW",
      "mw_as_of": "2026-03-27",
      "status": "in_progress",
      "status_phrase": "energized the first two buildings of the Abilene campus in under one year",
      "status_as_of": "2026-03-27",
      "url": "https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure/",
      "source": "primary",
      "notes": ""
    },
    {
      "id": "crusoe-abilene-microsoft-900mw",
      "name": "Crusoe 900 MW AI factory campus (Abilene, Microsoft)",
      "operator": "Crusoe (Microsoft tenant)",
      "place": "Abilene, Texas, USA",
      "admin1": "Texas",
      "country_iso3": "USA",
      "region": "NORAM",
      "lat": 32.44645,
      "lon": -99.7475905,
      "mw": 900,
      "mw_grain": "facility_power",
      "mw_phrase": "Supporting large scale AI workloads for Microsoft, the 900 MW site includes two new buildings and an onsite power plant",
      "mw_as_of": "2026-03-27",
      "status": "in_progress",
      "status_phrase": "Land clearing and site preparation for the new campus are already underway",
      "status_as_of": "2026-03-27",
      "url": "https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure/",
      "source": "primary",
      "notes": ""
    },
    {
      "id": "project-mica-kansas-city",
      "name": "Project Mica",
      "operator": "undisclosed on Port KC primary",
      "place": "Kansas City Northland (I-435 and Highway 169), Missouri, USA",
      "admin1": "Missouri",
      "country_iso3": "USA",
      "region": "NORAM",
      "lat": 39.100105,
      "lon": -94.5781416,
      "mw": 700,
      "mw_grain": "facility_power",
      "mw_phrase": "The full development will draw nearly 700 MW of power",
      "mw_as_of": "2025-07-01",
      "status": "announced",
      "status_phrase": "",
      "status_as_of": "2025-07-01",
      "url": "https://portkc.com/project/project-mica/",
      "source": "primary",
      "notes": ""
    },
    {
      "id": "scala-ai-city-eldorado",
      "name": "Scala AI City",
      "operator": "Scala Data Centers",
      "place": "Eldorado do Sul, Rio Grande do Sul, BRA",
      "admin1": "Rio Grande do Sul",
      "country_iso3": "BRA",
      "region": "LATAM",
      "lat": -29.9976311,
      "lon": -51.3063965,
      "mw": 4750,
      "mw_grain": "interconnection_request",
      "mw_phrase": "When complete, it will provide 4.75 GW of power across a 10 million-m² site",
      "mw_as_of": "2025-05-14",
      "status": "announced",
      "status_phrase": "",
      "status_as_of": "2025-05-14",
      "url": "https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html",
      "source": "primary",
      "notes": ""
    },
    {
      "id": "elea-rio-ai-city",
      "name": "Rio AI City",
      "operator": "Elea Data Centers",
      "place": "Olympic Park, Rio de Janeiro, BRA",
      "admin1": "Rio de Janeiro",
      "country_iso3": "BRA",
      "region": "LATAM",
      "lat": -22.9997404,
      "lon": -43.3659929,
      "mw": null,
      "mw_grain": "not_disclosed",
      "mw_phrase": "",
      "mw_as_of": "",
      "status": "in_progress",
      "status_phrase": "The first phase of Rio AI City, now in progress, includes the operational RJO1 site and the construction of RJO2, starting in 2026",
      "status_as_of": "2025-05-08",
      "url": "https://eleadatacenters.com/en/rio-ai-city/",
      "source": "primary",
      "notes": "Do not display 1.5 GW as IT; that phrase is certified renewable energy capacity."
    },
    {
      "id": "stargate-uae-abu-dhabi",
      "name": "Stargate UAE",
      "operator": "Khazna Data Centers (G42); OpenAI and Oracle to operate",
      "place": "Abu Dhabi, ARE",
      "admin1": "Abu Dhabi",
      "country_iso3": "ARE",
      "region": "MENA",
      "lat": 24.4538352,
      "lon": 54.3774014,
      "geo": "named_place/emirate",
      "mw": 1000,
      "mw_grain": "it_capacity",
      "mw_phrase": "Stargate UAE, a 1GW large-scale AI infrastructure cluster",
      "mw_as_of": "2025-10-16",
      "status": "in_progress",
      "status_phrase": "construction is now well underway and progressing steadily toward the planned 2026 delivery",
      "status_as_of": "2025-10-16",
      "url": "https://www.prnewswire.com/news-releases/g42-provides-update-on-construction-of-stargate-uae-ai-infrastructure-cluster-302586430.html",
      "source": "primary",
      "notes": "lat/lon is the Nominatim Abu Dhabi city centroid, not a street parcel."
    },
    {
      "id": "datavolt-neom-oxagon",
      "name": "DataVolt / NEOM net-zero AI factory (Oxagon)",
      "operator": "DataVolt",
      "place": "Oxagon, NEOM, Tabuk Province, SAU",
      "admin1": "Tabuk",
      "country_iso3": "SAU",
      "region": "MENA",
      "lat": 27.5679316,
      "lon": 35.5460342,
      "geo": "named_place",
      "mw": 1500,
      "mw_grain": "facility_power",
      "mw_phrase": "the 1.5-gigawatt factory will integrate a wide range of computing densities",
      "mw_as_of": "2025-02-10",
      "status": "announced",
      "status_phrase": "",
      "status_as_of": "2025-02-10",
      "url": "https://www.neom.com/en-us/newsroom/datavolt-signs-agreement-with-neom",
      "source": "primary",
      "notes": "lat/lon is the Nominatim named-place centroid for Oxagon (Duba / Tabuk), not a street parcel."
    },
    {
      "id": "vantage-altarea-bordeaux",
      "name": "Altarea / Vantage AI and cloud data center campus (Bordeaux)",
      "operator": "Vantage Data Centers / Altarea",
      "place": "close to Bordeaux, FRA",
      "admin1": "Gironde",
      "country_iso3": "FRA",
      "region": "EU",
      "lat": 44.841225,
      "lon": -0.5800364,
      "geo": "named_place",
      "mw": 400,
      "mw_grain": "interconnection_request",
      "mw_phrase": "Altarea has already secured a 400MW power connection with the French utility",
      "mw_as_of": "2026-02-24",
      "status": "announced",
      "status_phrase": "",
      "status_as_of": "2026-02-24",
      "url": "https://www.altarea.com/en/altarea-and-vantage-data-centers-announce-strategicpartnership-to-develop-ai-and-cloud-data-center-campus-in-france/",
      "source": "primary",
      "notes": "lat/lon is the Nominatim Bordeaux city centroid. The primary says close to Bordeaux, not a street parcel."
    },
    {
      "id": "applied-digital-ellendale-coreweave",
      "name": "Ellendale data center campus (CoreWeave leases)",
      "operator": "Applied Digital (CoreWeave tenant)",
      "place": "Ellendale, North Dakota, USA",
      "admin1": "North Dakota",
      "country_iso3": "USA",
      "region": "NORAM",
      "lat": 46.00275,
      "lon": -98.527046,
      "mw": 250,
      "mw_grain": "it_capacity",
      "mw_phrase": "Applied Digital will deliver 250 megawatts (MW) of critical IT load to host CoreWeave's",
      "mw_as_of": "2025-06-02",
      "status": "in_progress",
      "status_phrase": "",
      "status_as_of": "2025-06-02",
      "url": "https://ir.applieddigital.com/news-events/press-releases/detail/123/applied-digital-announces-250mw-ai-data-center-lease-with",
      "source": "primary",
      "notes": ""
    },
    {
      "id": "xai-colossus-memphis",
      "name": "Colossus (Memphis)",
      "operator": "xAI / SpaceXAI",
      "place": "Memphis, Tennessee, USA",
      "admin1": "Tennessee",
      "country_iso3": "USA",
      "region": "NORAM",
      "lat": 35.146026,
      "lon": -90.0517786,
      "mw": null,
      "mw_grain": "not_disclosed",
      "mw_phrase": "",
      "mw_as_of": "",
      "status": "operational",
      "status_phrase": "",
      "status_as_of": "",
      "url": "https://x.ai/memphis",
      "source": "primary",
      "notes": ""
    },
    {
      "id": "amazon-stack-caddo-bossier",
      "name": "Amazon / STACK data center campuses (Caddo and Bossier Parishes)",
      "operator": "STACK Infrastructure (Amazon tenant)",
      "place": "Shreveport / Caddo and Bossier Parishes, Louisiana, USA",
      "admin1": "Louisiana",
      "country_iso3": "USA",
      "region": "NORAM",
      "lat": 32.5135356,
      "lon": -93.7477839,
      "mw": null,
      "mw_grain": "not_disclosed",
      "mw_phrase": "",
      "mw_as_of": "",
      "status": "announced",
      "status_phrase": "",
      "status_as_of": "",
      "url": "https://www.aboutamazon.com/news/company-news/amazon-data-center-louisiana-new-jobs",
      "source": "primary",
      "notes": "multi-campus parish announcement"
    },
    {
      "id": "amazon-pecos-county",
      "name": "Amazon planned data center campus (Pecos County)",
      "operator": "Amazon",
      "place": "Pecos County, Texas, USA",
      "admin1": "Texas",
      "country_iso3": "USA",
      "region": "NORAM",
      "lat": 30.7857437,
      "lon": -102.8065415,
      "mw": null,
      "mw_grain": "not_disclosed",
      "mw_phrase": "",
      "mw_as_of": "",
      "status": "announced",
      "status_phrase": "",
      "status_as_of": "",
      "url": "https://www.aboutamazon.com/news/company-news/amazon-pecos-county-texas-data-center-clean-energy-jobs",
      "source": "primary",
      "notes": ""
    },
    {
      "id": "aws-new-carlisle-rainier-site",
      "name": "AWS New Carlisle / St. Joseph County campus (Project Rainier site)",
      "operator": "Amazon Web Services",
      "place": "New Carlisle (St. Joseph County), Indiana, USA",
      "admin1": "Indiana",
      "country_iso3": "USA",
      "region": "NORAM",
      "lat": 41.7056871,
      "lon": -86.5098231,
      "mw": null,
      "mw_grain": "not_disclosed",
      "mw_phrase": "",
      "mw_as_of": "",
      "status": "operational",
      "status_phrase": "",
      "status_as_of": "",
      "url": "https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster",
      "source": "primary",
      "notes": "Rainier is multi-state; this pin is only the named Indiana site. Do not print 2.2 GW."
    },
    {
      "id": "fermi-project-matador",
      "name": "Project Matador",
      "operator": "Fermi America",
      "place": "Carson County (Texas Panhandle / Amarillo area), USA",
      "admin1": "Texas",
      "country_iso3": "USA",
      "region": "NORAM",
      "lat": 35.3636563,
      "lon": -101.3353895,
      "mw": 222,
      "mw_grain": "facility_power",
      "mw_phrase": "covers a facility supported by 222 megawatts (MW) of total facility power",
      "mw_as_of": "2026-08-10",
      "status": "in_progress",
      "status_phrase": "Construction at Project Matador is well underway",
      "status_as_of": "2026-08-10",
      "url": "https://investor.fermiamerica.com/fermi-announces-binding-lease-agreement-with-tensorwave",
      "source": "primary",
      "notes": "Do not display 17 GW as the pin MW. 17 GW is planned private-grid scale subject to customer agreements."
    },
    {
      "id": "google-wilbarger-county",
      "name": "Wilbarger County data center",
      "operator": "Google",
      "place": "Wilbarger County, Texas, USA",
      "admin1": "Texas",
      "country_iso3": "USA",
      "region": "NORAM",
      "lat": 34.0265157,
      "lon": -99.2085961,
      "mw": null,
      "mw_grain": "not_disclosed",
      "mw_phrase": "",
      "mw_as_of": "",
      "status": "in_progress",
      "status_phrase": "",
      "status_as_of": "",
      "url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/data-center-wilbarger-county/",
      "source": "primary",
      "notes": "Do not copy 7,800 MW grid generation into campus MW."
    },
    {
      "id": "airtrunk-mel2-melbourne",
      "name": "MEL2",
      "operator": "AirTrunk",
      "place": "Melbourne's North-west, Victoria, AUS",
      "admin1": "Victoria",
      "country_iso3": "AUS",
      "region": "OCEANIA",
      "lat": -37.8142454,
      "lon": 144.9631732,
      "mw": 354,
      "mw_grain": "facility_power",
      "mw_phrase": "",
      "mw_as_of": "",
      "status": "announced",
      "status_phrase": "",
      "status_as_of": "",
      "url": "https://airtrunk.com/airtrunk-expands-australian-platform-with-a-second-hyperscale-data-centre-campus-in-melbourne/",
      "source": "primary",
      "notes": ""
    },
    {
      "id": "airtrunk-mel1-melbourne",
      "name": "MEL1",
      "operator": "AirTrunk",
      "place": "Melbourne, Victoria, AUS",
      "admin1": "Victoria",
      "country_iso3": "AUS",
      "region": "OCEANIA",
      "lat": -37.8142454,
      "lon": 144.9631732,
      "mw": 276,
      "mw_grain": "facility_power",
      "mw_phrase": "",
      "mw_as_of": "",
      "status": "operational",
      "status_phrase": "",
      "status_as_of": "",
      "url": "https://airtrunk.com/airtrunk-expands-australian-platform-with-a-second-hyperscale-data-centre-campus-in-melbourne/",
      "source": "primary",
      "notes": "Existing-campus list on the MEL2 primary. Do not add SYD1/SYD2."
    },
    {
      "id": "airtrunk-syd3-sydney",
      "name": "SYD3",
      "operator": "AirTrunk",
      "place": "Sydney, New South Wales, AUS",
      "admin1": "New South Wales",
      "country_iso3": "AUS",
      "region": "OCEANIA",
      "lat": -33.8698439,
      "lon": 151.2082848,
      "mw": 330,
      "mw_grain": "facility_power",
      "mw_phrase": "",
      "mw_as_of": "",
      "status": "operational",
      "status_phrase": "",
      "status_as_of": "",
      "url": "https://airtrunk.com/airtrunk-expands-australian-platform-with-a-second-hyperscale-data-centre-campus-in-melbourne/",
      "source": "primary",
      "notes": "Existing-campus list on the MEL2 primary. Do not add SYD1/SYD2."
    }
  ]
}